Gas Pipes in Livermore

The A-1 Total Service Plumbing team back at it upgrading gas pipes in Livermore, California! A busy start to an always busy week, we found ourselves at a Hydrogen Production Plant upgrading 375-feet of gas piping. The job began by excavating three areas to prep for the gas pipe.
Excavation of three pits started with #1 at the street, #2 in the middle and #3 is at the concrete slab. The A1TSP technician  began using a 2” splitter head to split the existing polyethylene gas line then the 4” splitter head on polyethylene gas pipe. All pipe was pressure tested before installing to 60 PSI and will be re-tested once the risers are fused on.